All documentation

Builder · General contractor · Total contractor · Site supervision

The trade package that simplifies the site instead of complicating it

Neolia is specified in your tender documents, or you are thinking of offering it as an alternative: here is exactly what it changes for your budget, your schedule and your warranties. No sales jargon.

1 trade package
for the intercom, the meter readings and the equipment data
0 riser
intercom cabling to pull, no metering bus between floors and plant room
1 trade package
the active equipment, the cabling and the installation work in the electrical works package, to the references we specify
6'440 CHF
saved on the intercom and metering package of a typical building with 12 dwellings and one stairwell
01 · BUDGET

The active equipment stays in your electrical works package

On new builds, your electrician orders the active equipment to the references we specify from their distributor, and resells it within their trade package together with the cabling, power supplies, builder's openings, connections and labour. One single contact on site, and the equipment warranty follows the usual chain of your electrical trade package instead of depending on a third party. Neolia supplies no equipment and invoices nothing during construction: operating fees only start at activation. No time-and-materials billing, no extras during construction.

DetailA stairwell is an access point to be fitted with a door station, and an emergency exit is not one. The meters remain in the heating and plumbing packages: Neolia reads them by radio, there is no metering cabling left. On renovations the model is different: Neolia funds the equipment and its installation work from 8 units per stairwell.
02 · COORDINATION

Fewer interfaces between trades

Traditionally, the intercom, the metering cabling and the readings bring in three firms whose work overlaps, and every interface causes rework. Here, your electrician powers the door station and fits the sensors, Neolia commissions. One point of contact.

03 · CONDUITS AND SCHEDULE

No intercom riser, no M‑Bus

The door station talks IP, the meters talk radio: no intercom riser and no wired metering bus to conduit and connect. Less crowded conduits, fewer holes to drill, and a whole item off the critical path of your finishings.

04 · END OF WORKS

A handover with no dependency

Commissioning is done remotely once the power supply is in place: no technician to wait for to program the names the day before the keys change hands. The building is delivered with its infrastructure already live and documented.

05 · WARRANTIES

You deliver the trade package, the operator takes over

You sign the operating agreement, then whoever operates the building (property management company, condominium or owner) takes it over by an amendment signed with you and with us. If they take it over before activation, you pay nothing. Otherwise, you pay until the takeover, and the contract ends after twelve months if nobody takes it over. The service is part of operation, not of your construction warranty.

06 · FIRST PROJECT

Your first building

On your first project, we check your drawings and your provisions, and we remain reachable for your questions throughout the works.

07 · THE WORKED EXAMPLE AND THE 3 STEPS

Building with 12 dwellings, one entrance

Traditional: shared door station (800 CHF, supply) + indoor units fitted, intercom conduits and M‑Bus cabling (12 × 470 CHF)6'440 CHF
With Neolia: those three items disappear. What remains is the active equipment, ordered by your electrician to the references we specifyElectrical works package
What leaves your tender, on a like-for-like comparison6'440 CHF
DetailThis figure is that of the infrastructure avoided: intercom conduits, indoor stations and metering cabling. The active equipment, on the other hand, still has to be priced in your electrical works package, to the references we specify. On renovations the model is different: Neolia funds the equipment and its installation work from 8 units per stairwell.
01
SpecifyNeolia appears in the tender documents. We supply the wording and check your drawings.
02
InstallYour electrician powers the door station and fits the sensors. Commissioning is remote.
03
Hand overThe operator takes over the contract by an amendment. Your payments stop on that date.

Price your first Neolia trade package

Write to us with your questions about the works. We reply within two working days.

Request a demo Log in to my account