Resources
Resource centre.
Neolia guides, documentation and technical information. Everything is open, with no account.
0 result for your search.
Nothing under that word. Try another term, or ask us directly.
No resource in this category for this profile. Choose « All » to see them all.
No resource in this category for this profile. Choose « All » to see them all.
No resource in this category for this profile. Choose « All » to see them all.
No resource in this category for this profile. Choose « All » to see them all.
Where to start five steps, depending on your project
Five steps. The first three happen without us.
- 1 Reread your billing contract* Remaining term, notice, devices rented or sold.
- 2 Note the end date It sets the timetable, not us.
- 3 Tell whoever decides The owner, the owners' meeting, or your property manager.
- 4 Talk to Neolia about it 30 minutes on your building and your dates.
- 5 We do the rest Contract, installation, commissioning, first statement.
The contract that binds you to the provider handling meter reading and the preparation of the individual heating and hot water cost statement. On your service charge statement it appears as a line such as « heating and hot water costs » or « reading and statement costs ». Check the remaining term, the notice period, and whether the meters and heat cost allocators are rented or sold.
Five steps, and no Neolia active equipment to price.
- 1 Specify it in the tender documents Our standard wording is ready to copy.
- 2 Send us the drawings We confirm the positions and the builder's openings.
- 3 The active equipment stays in your package Your electrician orders it to the references we specify.
- 4 Your electrician installs Cabling, power supplies and devices: one package, one contact.
- 5 The operator takes over At handover, under the agreed contractual arrangement.