All documentation

Property developer · Client · Architect

Why a Neolia building is easier to defend at sale and at letting

The factual case, with figures, to defend specifying Neolia before an investment committee, a buyer or a bank. Seven arguments, no slogans.

40%
of Swiss energy consumption comes from buildings (SFOE)
3 times
difference in heating consumption between comparable dwellings in the same building, and up to 8 times for water. Without individual billing, the gap is spread across everyone (SFOE)
6'440 CHF
of the intercom and metering package that disappear from a typical building with 12 dwellings and one stairwell (details on card 07)
0 CHF
in operating fees to pay if the operator takes over the contract before activation
01 · MARKET

Value is decided in operation

Buildings account for about 40 % of Swiss energy consumption. Institutional buyers, banks and property managers now judge an asset on its operating data: real consumption, incident history, service charge statements that can be checked. A Neolia building produces them from day one.

FactThe Swiss market pays a value premium for buildings that are efficient and transparent about their charges.
02 · CONDOMINIUM SALES

An argument for your brochure

At a comparable price and location, the flat that offers a video intercom on the phone, consumption tracking and technical alerts stands out at the moment the buyer hesitates. After the sale, ancillary costs are transparent from the first year: real readings, not estimates.

FactDisputes over service charge statements are a classic tenancy conflict. Consumption measured per dwelling defuses them at source.
03 · COMPLIANCE

Compliant with new-build requirements as standard

The MoPEC model provides for individual billing above certain thresholds, transposed according to each cantonal regulation. The applicable requirements must therefore be checked canton by canton. Neolia carries it out under the DIFEE model, individual energy and water cost billing, with no M-Bus riser and no manual reading: the meters communicate by radio and readings are continuous. Your planner has nothing special to allow for.

RegulationMoPEC 2014, base module: the model provides for individual billing above certain thresholds, adopted according to each canton's own rules. Art. 257a and 257b CO: a tenant only owes an ancillary cost if the lease expressly provides for it, and nothing is automatic.
04 · YIELD

In rentals, a more competitive net rent

In a building with central heating, consumption varies threefold between comparable dwellings, and by up to eight times for water (SFOE). Without individual billing, this gap is spread across everyone: with it, nobody heats for the neighbours any more. At equal net rent, the all-inclusive rent becomes more attractive. In a market with 0.93 % of vacant dwellings (OFS, 1 June 2026), the difference shows at re-letting.

05 · MEASURABLE SUSTAINABILITY

A documented climate trajectory

Continuous monitoring catches what nobody sees: a boiler drifting, a leak, ventilation running for nothing. Water damage is the leading cause of building claims in Switzerland. And consumption read month after month shows the real performance of the building, the figure missing from most CECB files.

06 · A CLEAN EXIT

You specify, the operator takes over

The contract follows the building: you sign the operating agreement, then the operator takes it over by an amendment, whether a property management company, a condominium or an owner. If they take it over before activation, you pay nothing. Otherwise, you pay until the takeover, and the contract ends after twelve months if nobody takes it over. Once the takeover is done, you keep neither a subscription nor any operating responsibility.

07 · BUILD COST

And it costs less to build

Only the items that really disappear are counted: shared door station, indoor units, intercom conduits and M‑Bus cabling. The meters stay in the heating and plumbing packages. Excl. VAT, on a building with 12 dwellings and one stairwell:

Traditional solution: shared door station (800 CHF) + indoor units, conduits and M‑Bus (12 × 470 CHF)6'440 CHF
Neolia: the active equipment joins the electrical trade package, to the references we specifyElectrical works package
What leaves the tender, before the operating gains are even counted6'440 CHF
DetailThis figure is that of the infrastructure avoided: intercom conduits, indoor stations and metering cabling. The active equipment, on the other hand, still has to be priced in the electrical works package, to the references we specify. On renovations the model is different: Neolia funds the equipment and its installation work from 8 units per stairwell.

Specify it once, check everything yourself

Write to us and we will look at your project with you. We reply within two working days.

Request a demo Log in to my account