A Neolia project, step by step

Who does what, when, and what stays your responsibility: the five phases of a project with Neolia, from the tender documents to handing over the keys. Print it for your site manager.

1

Tender and planning

Neolia is in the tender documents, with standard wording in the specification text to copy. You send the drawings: we confirm the positions and the radio coverage, list the compatible meters for the heating and plumbing package, then send back the exact provisions drawing. You sign the building's operating agreement, for a term of 36 or 60 months. No equipment to buy from Neolia: the active equipment is priced in your electrical trade package. If the operator takes over the contract before activation, you pay Neolia nothing. Otherwise, you pay for operation until the takeover, and the contract ends after twelve months if nobody takes it over.

YouNeolia
2

Structural works

Two things: an empty conduit to each entrance door station, and a 230 V supply with an Ethernet socket for the gateway, on a middle floor or at a high point on the riser, not in the basement. No riser, no metering bus between floors.

Your bricklayerYour electrician
3

Fit-out works

Your electrician pulls the Cat 6 on PoE to each door station, the door release supply (12/24 V depending on model) to each controlled door, and prepares the recess to the provisions drawing. The heating and plumbing trades fit the meters agreed with us, like ordinary meters. No metering connections.

Your electricianHVAC and plumbing
4

Commissioning

Once the door station, the gateway and the sensors are installed and connected by your electrician, Neolia commissions everything remotely: accounts, call buttons, readings, monitoring. Coverage test and handover report included. No technician to wait for at the end of the works.

Your electricianNeolia
5

Building handover

The occupants' names are set on the door station before the keys are handed over. The operator takes over the contract by an amendment signed by you, by them and by Neolia, and your payments stop on the takeover date (see the transfer explained). The building is delivered documented.

NeoliaThe operator
SPLIT

Who does what, in one table

You / your tradesNeolia
Drawings and builder's openingsSend the drawings, incorporate the provisions drawingReview, provisions drawing, meter list
CablingPower for door stations + gateway, empty conduits, power for the monitoring modules (230 V + DIN rail, one module for two devices)No cabling: everything else is radio or IP
Active equipmentDoor station, gateway, 802.3at PoE switch and monitoring modules, ordered by your electrician to the specified references and resold within their packageReferences specified, nothing to buy from Neolia
InstallationDoor station, gateway, sensors (electrician); meters (HVAC and plumbing)Nothing: Neolia delivers no equipment in new builds
ConfigurationNothing: no on-site programmingRemote commissioning and testing, report included
After handoverNothing : operation is taken over by the operator, under the agreed contractual arrangementOperation, support, management platform
PRICING

What disappears from the site, in figures

Items of a traditional wired installation that Neolia removes, at market prices, supply and installation, excl. VAT:

Item removedCost avoided
Multi-dwelling street door station, supply only (standard market model)800 CHF / entrance
Indoor unit, supplied and fitted250 CHF / dwelling
Intercom conduits and cabling (riser)120 CHF / dwelling
M‑Bus cabling for the meters100 CHF / dwelling

Example on a stairwell of 12 units: the traditional intercom and metering infrastructure amounts to 6,440 CHF, between the riser, the wired metering bus and commissioning by a specialist contractor. Those three items leave the site. What remains is the active equipment, which your electrician orders to the references we specify and resells within their package.

These amounts are installation costs, paid once. They have nothing to do with the 120 CHF per dwelling per year for operation, which pay for the whole operation once the building is in service.

Method: a like-for-like comparison, same scope. Only the items really removed are counted. Fitting and wiring the door station, like fitting the LoRaWAN gateway, are needed on both sides and are counted on neither; the M‑Bus concentrator is offset by the LoRaWAN gateway. The meters stay in the heating and plumbing packages.

CHECKLIST

The site manager's checklist

NEOLIA SITE · CHECKLIST [ ] Drawings sent to Neolia, provisions drawing received and incorporated [ ] Neolia operating agreement signed (term: 36 or 60 months) [ ] LoRaWAN meter models (major manufacturers) approved with Neolia, passed on to the HVAC and plumbing package [ ] Empty conduit laid to each door station position [ ] Cat 6 cable (PoE) left ready at each door station [ ] 12/24 V door release power supply (AC or DC depending on model) planned at each controlled door [ ] Building internet router in place (fibre), subscription taken out (property management / building) [ ] 230 V power supply + Ethernet socket from the router in the plant room (gateway) [ ] Additional Ethernet cable(s) left ready according to the Neolia short study (extended building) [ ] Door station recesses to the dimensions of the provisions drawing [ ] Meters installed (HVAC and plumbing package), serial numbers recorded [ ] Installation of door station / gateway / sensors scheduled with the electrician [ ] Remote commissioning scheduled with Neolia (date: …) [ ] Commissioning report received and filed in the building file [ ] Occupants' names sent for provisioning before handover [ ] Service holder named (property management company / condominium / owner: …) [ ] Takeover amendment signed by the operator, the builder and Neolia